Wednesday 27 October 2010

Day 129 - Outside tiles arrive

The Quartzite tiles were delivered today (half tonne pallet worth). Not sure when the tiler is due back to lay them, but Doug prepped the front door step ready for them. Hopefully the weather will hold out.
The tapers were back again today & made some great progress. Front vestibule, dining room, laundry, and hallway round by the stairs was done inside the house, and the garage workshop was also tidied up. Still a bit more to do then the painters can get at it.
Talking of painting, our painter returned today and varnished a couple of the internal doors, along with the 2nd coat for the staircase.
Doug and the lads did some further work on the floor at the rear vestibule, and also 'framed' the outside drains rodding points (tidies them a good bit). On top of that some of the driveway was levelled out a bit, and a start has been made to fitting the shower screens. WC pans were also fixed in place.
We also got the order in for the carpets - using local company Taylor's in Banchory. Looking at a couple of weeks before they arrive, which should give the lads enough time to finish the internal works. Almost there!