Couple of the lads came out today to get the scaffolding erected in order to get a quick start on Monday for the roof building. Looking to get the slaters here a week Monday, so not long now till we're water proof ! The scaff is the click together stuff, so went up pretty fast.
The plinth for the oil tank was also completed and the empty tank landed safely on it. Heating engineer out on Monday to pipe things into the existing system, then we'll get the tank filled. Looks pretty massive mind!