Monday, 8 November 2010

Day 138 - Vestibule windows are in

At last the remaining two vestibule windows have been installed - and just as well given the dreadful weather than we're currently getting. We had 3 joiners here today to get them fitted, and the plasterboard has been installed inside already. Still some further wood work to do outside, along with insulation etc. This means that the vestibule is almost complete now.
The replacement back door also had to be altered today as it was sitting too low to allow the laundry tiling to be done. The frame has been raised up slightly, and the plasterwork has even remained relatively intact.
Painter continued with the varnishing inside. Not sure if anything was done outside, and there hasn't been any emulsion put on - which is a worry given that we need the painting inside completed within the next 6 days ! (there has been some filling work done though, so that may be the prep work required).