The plumber was here on Saturday and fitted the lime chip drain for the boiler condensed water drain. Really neat job & you don't see anything really. He also checked out the heating zones, and replaced some plastic pipework for copper.
Monday saw the painters return, along with the sparky & Doug (for a time). The sparky fitted both wet room extractor fans, though the duct has yet to be properly terminated into the soffits. However neither is working with the light, and comes off a separate switch, which I don't like. To be changed I think. Sparky also fitted the shaver points and the leads for the mirror lights (we have the wrong ones, so a delay in completing this). Not much electrical work to do now though.
Painters were working both inside & out today. The remaining windows & garage door were painted teal, so just the red ones to do now out there. Internally the painter stained the study & main wet room, and also varnished some more of the internal doors. He's also carrying on with the sanding work I started yesterday upstairs.