Monday 24 May 2010

Day 19 - Drain pipe run to the septic tank.

A lot of work done on the drains tie in to the septic tank. As you can see from the photo, the drive has had to be trenched pretty deep to complete the pipe run. The branch & pipe work is in place at the tank end (the main drains line has been cut into now). Hopefully complete this tomorrow & get the trench back filled.
Also today the foundation walls were erected outside Jenny's room - this is where the new front door & entrance porch will sit.
Chat with Doug the builder this evening & confirmed where we're going to locate the underfloor heating zone valves & manifolds. Looks like inside the rear workshop will be the best place. Won't be losing any space really in there as the location in in the current wall rebate.

0 comments:

Post a Comment