Friday 7 May 2010

Day 8 - Walls start to go up

Well as promised, the block work was started today - and all done in glorious sunshine. Blocks now extend from the East side of the existing house and form a perimeter attaching to the garage/workshop area (East side). All looks pretty good.
Concrete foundations set ok, although part has been back-filled near the garage (not sure why yet).
As well as the brick work, a lot of the waste masonry has been crushed, so that'll be useful for hardcore moving forward.