Day 71 - More plaster board

Quite a few things happening today. The plaster board continued to go in downstairs, with most of the East wall and ceiling now completed (though there are still cables to be dropped down in some places).
Doug was also here today & sorted out the 2 x shower recesses in the floor to accept the GRP wet room trays that have now arrived. A bit of jiggery pokery and they should be fine in terms of getting the waste pipe to line up properly.
The slaters also made a brief return to site today (but didn't really do anything !). However the copper finial arrived, so they were able to check that out. Hopefully be seeing that installed by early next week.