The windows have all arrived, with the exception of the ones that have been specially measured (the triangular ones at the South dormer & the ones above the front entrance). Some of them have been initially fitted (still to be properly fixed & sealed), and they look great. Really starting to look like a house now !
As well as the windows, a load of insulation & plasterboard also arrived, though this is being stored mainly in the garage for now as the priority is the windows.
Things are certainly moving one, and when the slaters return next week we should be well on the way to a properly water tight house.
0 comments:
Post a Comment