Thursday, 13 May 2010

Day 12 - Hardcore backfill

Continued with backfilling what will be the 2 bedrooms and bathroom. Waste pipework has also bee set in the bathroom, however looking at the space we've really got there the plan is to ditch the bath & stick with the shower. A shame we missed that, but it'll be ok I think.
Rainwater pipework has also been installed along the South wall, however the electric cable still has to be trenched in.
Still a fair bit of foundation walls to be built at the study area and along the front boundary of the extension. Looking good though !