Progress made on the rain water drains today, and as well as the 'network' being installed at the front right area (around where the new back door is going), drains were also installed beside the garage in front of the rear workshop.
No work planned for tomorrow, but the lads should be back on Thursday with the intention of laying the first level of the concrete floor. Hopefully the whole floor area will be done in one.
0 comments:
Post a Comment