Ah well, we never got the concrete floor poured today, but all the preps have been done ready for it tomorrow. The floor area has been back filled with sand & levelled off ready. Not sure what time the mixer is coming tomorrow, but hopefully the weather will stay as nice as it's been the past few days.
As well as the levelling, further work has been completed on the sewerage drains, and the man-way at the house has been mostly backfilled. The existing drains pipe to the septic tank has also been further exposed ready to be cut into to install the other additional man-way & pipe tie in.
Front brickwork at the garage has also been sorted (some of it came loose), so that's looking fine now.