Saturday, 15 May 2010

Day 14 - Ensuite drains in.

Despite it being Saturday, Doug still worked through the morning, which was great. The drains for the ensuite have now been installed and the area backfilled. The 2 main drain headers now run North & West & tie together in the new drains branch at the front of the extension (with a manhole top to it). This will give really good access in the future if need be.