Friday, 15 October 2010

Day 120 - New hall cupboard doors

The sliding doors have now been fitted to the hall cupboard. Same manufacturer as the bedroom ones, and they look really good I think. Match the flooring well.
Oak floor laying has continued a pace, and we've now reached the dining room. A number of the door thresholds have also been installed, as well as some stained door surounds. The wood stain on the soft wood looks good too, and matches the oak boards well.
Even though it's Saturday tomorrow, we're expecting the plumber on site. Still a few things for him to do - he can finish off the ensuite now that the worktops are properly in, and there's also the WC's to fit properly along with the lids. Be good to get a chance to see him as we need to go over how the underfloor heating works !

0 comments:

Post a Comment