Thursday 30 September 2010

Day 108 - Rails etc

The main wet room is now mostly complete, and just needs the final plumbing bits done on the WC and the sparks to install the mirror light & shaver point. Once that's done there's some silicon to go in, then the shower screen. (Mind you we still need to get the WC vent piped through the roof & the window wood stained before we can get much use out of it !).
The joiners also carried on with the ensuite, and as well as the towel rail etc being installed, the WC cabinet is in place & the wall unit is up. Unfortunately the mirror unit for the ensuite was damaged in transit so we'll need to get a replacement. Not great at this stage of the game.
The weather stayed decent today though, so it looks like the cladding outside is now completed - though there are a couple of planks that look like they need lowered near the new front entrance, and we still have a water leak problem at the new back door, though Doug is onto that one.
Don't know who's coming tomorrow, but it would be good to see the plumber's electrician to get after the underfloor heating work.

0 comments:

Post a Comment