The tiles for both the new wetrooms arrived this afternoon, which is a really fast service from Atlantis in Aberdeen. We've kept the floor & wall tiles the same for both, but have changed the detail finishing tiles to differentiate between the two. Tiler is planned for Monday, so we should see the furniture etc being installed towards the end of next week.
Slaters were on site today & tidied a few areas of the roof up (flashing wise), installed the ridge covers on the SE corner, and also got the flashing place at the new front entrance. No sign of the finial going on - maybe they're saving that till last.
Painting foreman was on site & discussion had on the expectations of windows finishing (and general quality of paintwork). Some 'alignment' done, so I think things should move on smoothly from here.
Joiners have been busy outside getting the larch on & have made a brilliant job profiling the lengths to match in with the existing house brickwork.
Tomorrow it looks like there's going to be another house full - plumber is back to carry on with the drains & heating work, whilst the tapers & painters are coming to carry on in both the new & existing parts of the house.