Some of the lads came out on Saturday - unfortunately with the weather being so wet the joiners didn't stay long (they were looking to get after the cladding outside). However both the taper & the plumber were here for a bit. The taper managed to get coving up in the existing hall (so now joined up with the extension), the diningroom & the 'original' front hall.
The plumber fitted new radiators in both the diningroom & the new front vestibule (they're not piped up yet though). He also got the heating back on again - was nothing more than a trip switch (but was labelled up wrong).
For my part I replaced some more of the hideous roof spots in the laundry & hall. Old spots have been removed & the hole replaced with a piece of plasterboard & filled. New ceiling light fittings also popped in. Looks much better & much lighter !
0 comments:
Post a Comment