Thursday 9 September 2010

Day 92 - Painting inside starts

The painters have started in the house and have put the first coats on the walls & ceilings. Natural Calico for most of the house, with the exception of the study & Jenny's room. Some of the window frames also had their first coat of stain on them too, however it's not up to expectations, so there's some remedials to be done (unfortunately). Painters back tomorrow, so should get sorted out.
Ames taper was also here today (which we didn't expect) and has made a start where he can to the existing house. Some bits have been done prematurely I think though as there's still some sockets needing re-sited.
Joiners were busy outside (decent weather at last) and have put up some more of the larch cladding. Really starting to take shape out there & looking more like a home.
Spark was here and has got the power onto the extension now (garage still to do yet). This is great though as at last we have light in the evenings in there, which lets us get on with things.

0 comments:

Post a Comment