Friday 3 September 2010

Day 85 - Old bathroom knocked down

That's the old family bathroom demolished now, so now the 2 ends of the house are joined up, and the view from one end of the hall to the other is huge ! Looks really good, however now it's freezing as the new part of the house has builders in & out of it all day, there's no power & the heating's not on yet. Soon though.
Progress was also made installing the new boiler & pipework, and it's looking pretty tidy. All the old water pipework for the heating has now been removed from the hot cupboard, and once the new tank goes is, things will look a lot neater in there. Still on the heating, and the zone valves manifold has also been installed now & has been mounted on the wall. All labelled up too, which is great.
Bit of work for me to do last night now that we have more internal walls up (and open a bit). Ran TV cables to both Katy & Alice's room, and also a network link to Alice too. They won't be hooked up for a while, but at least the cables are run. Same deal for the network link in the hall, so the DSL connection shouldn't be disrupted again (until the phone point is moved).

0 comments:

Post a Comment